If an institution or subcontractor has a higher indirect cost rate than PCORI allows, can the applicant use their rate?

No. If an applicant’s indirect cost rate is higher than PCORI’s indirect cost rate limit, the applicant must use the 40 percent indirect cost rate. Additionally, if the institution has a federally negotiated or independently audited rate below 40 percent, the institution must use the lower rate.

 